Skip to main content

Our Inspection Services

LOLER and PUWER compliance

Every inspection is conducted by a qualified, independent Engineer Surveyor, delivering a clear, photographic digital report that duty holders can rely on for HSE compliance.

The intervals on each card are defaults. LOLER's 6 and 12 months apply unless an examination scheme drawn up by a competent person sets different ones.

Lifting Equipment Inspections

Hoists, slings, dock levellers, pallet trucks and lifting accessories, inspected under LOLER Regulation 9.

Interval: 12-monthly (6-monthly for accessories)

Crane Inspections

Tower cranes, mobile cranes, overhead travelling cranes and loader cranes: Thorough Examination by competent person.

Interval: 12-monthly (6-monthly for lifting persons)

Passenger & Goods Lift Inspections

Passenger lifts, goods lifts, platform lifts and dumbwaiters in commercial and residential buildings.

Interval: 6-monthly (12-monthly for goods-only)

Work at Height Equipment

MEWPs, scissor lifts, cherry pickers and mast climbers under LOLER, and fall arrest systems under the Work at Height Regulations.

Interval: 6-monthly (LOLER); fall arrest at suitable intervals (WAHR)

Mobile Plant Inspections

Telehandlers, excavators with lifting duties, forklifts and rough terrain plant, covered by LOLER and PUWER.

Interval: 12-monthly

Garage Equipment Inspections

Vehicle lifts, axle stands, jacks, MOT brake testers and ramps: LOLER and PUWER examination for garages and HGV workshops.

Interval: 12-monthly

Lifting Accessories Inspections

Slings, chains, shackles, eyebolts, hooks and lifting beams, each examined as a lifting accessory under LOLER Regulation 9.

Interval: 6-monthly

Theatre & Stage Equipment Inspections

Counterweight flying systems, performer flying rigs, scenic hoists, motorised bars and orchestra pit lifts, examined under LOLER.

Interval: 6-monthly for lifting persons, otherwise 12-monthly

Pallet Racking Inspections

Expert inspection of static pallet racking to HSE's HSG76 guidance and the SEMA Code of Practice, with damage risk classification.

Interval: At least annually (HSG76 and SEMA guidance)

Need more than one service?

We can combine multiple inspections into a single site visit across Kent, London and Essex.

Request a combined quote